Marconi Waltz - homage to Oud and van Doesburg
The construction
workmen spent all day erecting the sculpture. This man looked like a real
bronco buster when fastening fifteen bolts which were to keep the
construction together. Setting up the first two slabs took only a few
hours. The third gave much more difficulty, as it was to be fit under
the second and onto the first, and at the same time fall into one of the three stainless steel notches in
the foundation. The third crane came into action to lift the whole
construction in order to succeed.